The WB(S) series pump is a stainless steel corrosion-resistant centrifugal micro-pump independently developed by our company. The pump impeller adopts a semi-open structure. With its excellent structure, performance, and design, along with flow-through components and connecting brackets made of high-quality stainless steel, the series boasts reliable corrosion resistance, convenient use and maintenance, compact structure, low energy consumption, and excellent sealing performance.
This series of pumps can transport liquids with temperatures not exceeding 103°C, containing fine soft particles or fibers, and with corrosive properties or hygienic requirements. It is widely used in industries such as food, beverages,pharmaceuticals, wastewater treatment, chemicals, electroplating, dyeing, and fine chemicals.
Model : WBS3-8-0.25
Rated head: 8m
Power : 0.25KW
Pipe diameter : 25/32mm
Rated flow rate : 3m³/h
Voltage : 220V/380V
